Award of Excellence for Coonamessett River Restoration

The American Council of Engineering Companies of Massachusetts (ACEC/MA) has awarded Tighe & Bond, Inter-Fluve, the Town of Falmouth (MA), and SumCo Eco-Contracting with a Bronze Engineering Excellence Award for the Coonamessett River Restoration and John Parker Road Bridge project.
In Other News:

Cotton Gin Mill Dam Removal
East Bridgewater-Cotton Gin Mill Dam Removal – BEFORE RESTORATION Image photo credit (top right and bottom): The Nature Conservency In Other News:

Phase 1 of The Strong Pond Dam Removal is Complete
This is the Strong Pond Dam Removal Project with a substantial amount of river restoration and sediment reuse.

SumCo Updates Parker Meadow Boardwalk and Walking Trail to be ADA Compliant
Parker Meadow boardwalk and walking trail were upgraded to be ADA compliant. The project included a new helical supported boardwalk, upgrades to an existing walking trail, and a viewing platform over a small pond.

SumCo makes improvements to Louise Levingston Cove
Work included accessibility improvements, stormwater runoff management, protection and enhancement of wildlife habitat, overall recreational upgrades, and public safety improvements.