Completed:
November 2016
Value:
$537,000
Project SYNOPSIS
Originally constructed in 1901, the stone dike protects the 2.8-mile barrier beach and was significantly damaged during the blizzard “Juno” in 2015. The Army Corps of Engineers contracted SumCo Eco in efforts to rebuild and repair the damaged dike. With the structure vulnerable to future storm events, this project was essential in increasing coastal resiliency as Long Beach provides shelter between Plymouth Harbor and Cape Cod Bay.