Louise Levingston Cove Improvement Project, Newton, MA

Infrastructure & Resiliency
Parks & Open Spaces

Completion: 
Fall, 2023

Value: 
$1,858,000

Project Synopsis

The project consisted of renovations and improvements to Louise Levingston Cove, a 0.5 acre park property located along the shoreline of Crystal Lake in Newton, MA. Enhancements were designed and built to ensure accessibility throughout the park, including an ADA-compliant cantilevered fishing platform, viewing areas, and accessible pathways, ramps, and benches.
 

Additional features included a system of terraced walls to create seating opportunities and to combat erosion on the steep slopes, stormwater runoff management, erosion control measures, protection and enhancement of wildlife habitat, overall recreational upgrades, and public safety improvements.

Project Gallery