SumCo Eco-Contracting stabilized this critical bank area on the Merrimack River for the City of Haverhill, Massachusetts using a combination of hard-armored toe, bioengineered slope treatment and plantings.
Date of Completion:
May 2011
Client(s):
City of Haverhill, Massachusetts
Riverbank Length: 550 linear feet
Turbidity curtain in place
Geotextile rolled-out
Stone toe excavated
Project Completed:
Large woody debris installation for habitat enhancement